Skip to content
Verden Engineering
Industrial process plant with piping, platforms and vessels

03 — REFINERIES

More from the catalytic reformer you already run.

We recalculate the operating point of an existing catalytic reforming unit: hydrogen, reformate and octane. The reactor stays in service.

Hydrogen

For the hydrotreaters, from the reformer as it stands.

Reformate

Output and the split of the components.

Octane

The product target the unit is asked to hold.

Catalyst life

How hard the reactor is pushed to get there.

THE UNIT

The reactor is already built. The question is how it is run.

Catalytic reforming sets the hydrogen the hydrotreaters can use, and the octane of the reformate. Feedstock and product demand move; the reactor does not.

A revamp, a catalyst change or a general plant model asks for capital, and often for time offline. This scope stays on the reformer and the control system already in place.

THE CALCULATION

Four facts the work is built on.

01

Reforming only

The model describes catalytic reforming reactions, not a general refinery model with the kinetics adjusted afterwards. Catalyst type and current activity go in with the feed.

02

Any licensor

Semi-regenerative, continuous regeneration, cyclic and hybrid units are in scope. Existing controls, and any optimiser already installed, stay in place.

03

The products

Parameters are set for the octane target and the hydrogen the rest of the site needs. The result breaks out reformate and dry gas, including a new feedstock.

04

No shutdown for the study

The calculation is offline. Production continues while the operating protocol is worked out, and a hardware project is not required to find the point.

THE ENGAGEMENT

From the unit data to a protocol operations can hold.

01

Read the unit

Duty, catalyst, feedstock, product targets and the constraints the reactor already has.

02

Set the protocol

Operating parameters for that unit, including a change of feedstock.

03

Hand it to operations

Training and support so the people who run the reformer can hold the new point.

The figures are calculated for the reformer in front of us. They are not copied from another plant.

Have a technical challenge? Let's scope it together.

Start a conversation